Watts News
 Published for the members of North Itasca Electric Cooperative
VOL. 22 NO. 10  -  October 2019

Summer to Winter Load Control Changeover

continued

Electric Thermal Storage - Water Heating and Pool Heating

Every weekday during winter months of October through April, approximately 2,700 hours.
Monday Friday
Restore time - 10:00 p.m.
Shed time 6:00 a.m.
8 hours

Electric Thermal Storage Space heating

Every day during winter months of October through April, approximately 3,900 hours.
Monday Friday
Restore time - 10:00 p.m.
Shed time 6:00 a.m.
8 hours

Electric Vehicle and ChargeWise

Every day during winter months of October through April, approximately 3,900 hours.
Monday Friday
Restore time - 11:00 p.m.
Shed time 7:00 a.m.
8 hours

Interruptible Water Heating Breathe Easy 4-hour (Program is closed to new loads.)

Total estimated winter control = 20 days/ 80 hours
Predefined control periods = None
Control limits = Maximum of 4 hours/day

Dual Fuel and Air Source Heat Pump

Total estimated winter control = 20 days/ 108 hours
Maximum allowable control = 400 hours/year
Predefined load control periods = None
Control limits = Maximum of 12 hours/day

Limited Interruption Dual Fuel (Program is closed to new loads.)

Total estimated winter control = 20 days/ 80 hours
Predefined load control periods = None